Observe
Reads the signals the elevator already produces: floor, direction, doors, service state. It listens. It does not intervene.
A retrofit device that learns your building’s rhythm and puts idle elevator systems to sleep between passengers, then wakes them before anyone arrives. It never touches certified safety control.
Cabin lighting, ventilation, displays and drive electronics keep drawing power through every quiet hour of the night.
Replacing the elevator is a capital project. Newer controllers idle efficiently, but the elevators already installed mostly cannot, and nothing retrofits the behaviour without reaching into the certified system that keeps passengers safe.
Reads the signals the elevator already produces: floor, direction, doors, service state. It listens. It does not intervene.
Learns this building’s own rhythm, on the device. No cameras, no identities, no cloud.
Puts idle subsystems into progressively deeper standby, then wakes them ahead of the next passenger, so the lift is ready before they are.
A deterministic safety shield filters every action to a pre-vetted set. The same code runs in simulation and on the installed device.
One edge module. One passive interface board. Removed, the elevator is exactly as it was.
An elevator is a certified life-safety system. That constraint came first, and it decided the architecture rather than the other way around.
Most of the elevators that will run in Gulf buildings in 2040 are already in their shafts, commissioned before idle-energy behaviour was something anyone specified.
Regulation has already named the behaviour. Abu Dhabi’s Estidama Pearl Rating System asks that lifts:
offer idle/downtime features allowing the lift to operate in a stand-by mode during off-peak periods.Estidama Pearl Building Rating System, credit RE-4 (Vertical Transportation)
For a building yet to be built, the right controller answers that. For the buildings that already exist, there has been no equivalent answer.
The system is built and tested end to end: forecasting, decision policy, safety shield, on-device services, and the measurement pipeline.
What it has not yet done is run in an occupied building. That is the next step, and it is structured deliberately: an independent supply-side meter, a baseline period before anything changes, then verification under IPMVP Option B and ASHRAE Guideline 14.
For pilot enquiries, technical questions, or partnership conversations:
elevai.lebanon@gmail.com